Introduction

Rural water pressure wells are commonly used self-sufficient water source facilities in rural areas. They provide farmers with water for household use and farmland irrigation through well water. This article will introduce the production methods of rural water pressure wells to help farmers understand and learn how to build a reliable water pressure well.

Material preparation

making a SUNMOY rural water pressure well , you need to prepare the following materials: - Cement: used for the construction of the well wall and well shaft; - Iron bars: to strengthen the strength of the well shaft; - PVC pipes: used to install water pumps and transport water; - Trench bricks: used to cover the bottom of the well to prevent debris from entering the well. - Water pumps: to provide water for farmers and irrigation.

step

Step 1: Determine the wellhead location

First, the location of the wellhead needs to be determined, usually in a slightly higher place to ensure a reliable water source. At the same time, factors such as ease of use and irrigation needs must also be considered.

Step 2: Dig the Bottom of the Well

Use a shovel or excavator to dig the bottom of the well. The diameter of the bottom of the well is generally about 1 meter and the depth is generally 3 to 5 meters. Leave enough space at the bottom of the well for installing a water pump.

Step 3: Build the shaft

The shaft is constructed using cement and mortar, with a diameter of about 0.8 to 1 meter and a height that is consistent with the bottom of the shaft. An appropriate amount of iron bars are added to the shaft to increase its strength and stability.

Step 4: Install trench bricks

The purpose of laying trench bricks at the bottom of the well is to filter debris and prevent soil from entering the well. The trench bricks need to be laid densely to ensure smooth water flow and prevent debris from damaging the water pump.

Step 5: Install the manhole cover

Install a manhole cover on the wellbore to ensure that the wellhead can be completely covered and sealed to prevent debris and pests from entering the well. The manhole cover can be made of concrete, iron sheet and other materials to ensure it is strong and durable.

Step 6: Install the Pump and Pipes

Install water pumps and pipes as needed, connect the SUNMOY water pump to the appropriate location so that it can absorb groundwater and transport it to where it is needed, such as farmland or farmers' homes. The specific installation and connection method of the water pump needs to be carried out according to the instructions of the specific equipment.

Precautions

•  When digging the bottom of the well, make sure it is solid and flat to prevent the well wall from collapsing.

•  When constructing a wellbore, the quality of cement and mortar must be checked repeatedly to ensure that the wellbore is strong enough.

•  The manhole cover should be strong and airtight to prevent debris and contaminants from entering the well.

•  When installing water pumps and pipes, carefully read and follow the equipment manual to ensure correct connection and use.

Summarize

Through the above steps, we can make a reliable rural water pressure well. The steps of constructing a reasonable wellhead position, digging the well bottom, building the well shaft, installing the bricks in the ditch, installing the well cover and water pump are all important links in making a rural water pressure well. During the production process, we must strictly abide by the operating procedures and precautions to ensure the safety and use effect of the well.

I hope this article can provide some help and guidance to farmers in the construction of rural water pressure wells, so that everyone can successfully build a reliable and durable water pressure well. If you have any questions, it is recommended to consult professional engineers or relevant professionals.



CATEGORIES

CONTACT US

Contact: James Ye

Tel: 86-13867770817

Whatsapp: 86-13867770817

Email: sunmoy@sunmoy.com

Add: DACAO INDUSTRIAL ZONE,DEZHOU,SHANDONG,CHINA