How to Properly Use and Maintain a Newly Drilled Well
After a new well successfully produces water, the initial use and maintenance methods directly determine its future water yield, water quality, and service life for many years to come. It's like treating a delicate "new organ," requiring a gentle "break-in period" and careful attention. The following are key points you need to focus on and implement.
I. Initial Use: Gentle Break-in, Avoid Over-pumping
The aquifer channels and filter layer around the well need to naturally compact and stabilize under dynamic conditions.
Core Principle: In the first 1 to 3 months, avoid continuous, heavy pumping for extended periods.
Why: Pumping the well water down to a very low level at once, or pumping continuously for several hours, is like suddenly opening a large hole in sandy ground. This can forcefully suck in fine sand, clogging the gaps around the filter pipe, and even damaging the newly formed natural filter layer, leading to sand production or a permanent decrease in water yield in the future.
Correct Practice: Adopt a strategy of "small amounts, multiple times, with intermittent pumping." For example, pump water in several sessions each day, pumping for 30 minutes to 1 hour each time, then stopping to allow the water level in the well to recover naturally. This helps the filter layer become denser and more permeable under the gentle impact of the water flow.
II. Water Quality Management: From Turbid to Clear, Patience is Key
Accept Initial Turbidity: In the first few pumping sessions, the water from a new well may be slightly turbid or contain trace amounts of fine sand. This is due to residual fine materials from drilling and is usually normal.
Treatment Method: Discard the initially pumped water directly; do not connect it to your household plumbing until the water flow becomes consistently clear. You can install a simple filter before the water enters your house.
Conduct Formal Water Quality Testing: This is the most important step. After the well has been in stable use for 2 to 4 weeks, be sure to take a water sample and send it to a qualified testing agency for comprehensive analysis (including bacteria, nitrates, hardness, heavy metals, etc.). This is the only scientific method to ensure the safety of your drinking water.
III. Daily Observation and Recording: Establish a "Health Record"
Monitor Pump Status: Pay attention to the sound and water output of the pump. If the water output drops sharply in a short period of time, or if you hear unusual suction noises, stop the pump immediately and inspect it.
Keep a simple log: Record the approximate duration and frequency of pumping, as well as your subjective observations of the water volume and quality (whether it's clear, and if there are any unusual odors). These records will help you detect any abnormal trends early on.
Maintain wellhead hygiene: Ensure the well cover or sealing cap is tightly closed to prevent rainwater, dirt, insects, or small animals from entering. Check that drainage around the wellhead is unobstructed.
IV. Planning the First Professional Maintenance
After about a year of use, or if you notice a gradual decrease in water output, consider hiring a professional to perform a maintenance well cleaning. This is not mandatory, but like a deep cleaning for a car, it can effectively remove fine particles that may have accumulated inside the well and around the filter layer, helping the well return to its optimal condition.
In summary, the initial maintenance of a new well focuses on "gentleness" and "patience." Remember the sixteen-character mantra: "Gentle pumping, water quality testing, maintaining cleanliness, and recording observations." Through scientific break-in and necessary testing, you can guide this new well through its "adolescence," becoming a reliable and clean water source for your family for decades to come. Remember, a good well is not only drilled, but also scientifically used and maintained.
Contact: Sunmoy
Tel: + 86 13867770817
Whatsapp: + 86 13867770817
Email: sunmoy@sunmoy.com
Add: DACAO INDUSTRIAL ZONE,DEZHOU,SHANDONG,CHINA